With plans in place to improve the surrounding roads to ease congestion, a hospital hired the CSE team to identify a number of underground cables, relocate to accommodate a new road layout and be installed to provide the hospital with a smoother service.
The underground cables were located and identified through the use of surveys and technical plans. It was agreed with the customer that a no-dig, Vacuum Excavation approach was to be taken in order to reduce the risk of striking live services.
Within a matter of hours, the Vacuum Excavator provided a quick, efficient and safe excavation to expose the cables ready for their relocation.
Recent Projects:
Vacuum Excavation Case Study: Culvert ExcavationVacuum Excavation Case Study: Underground UtilitiesVacuum Excavation Case Study: Safer Suction for a SubstationVacuum Excavation Case Study: Water Treatment PlantVacuum Excavation Case Study: Bridge ReinforcementVacuum Excavation Case Study: Gas LeakVacuum Excavation Case Study: 3 Sites, 1 Vacuum ExcavatorVacuum Excavation Case Study: Exposing Ductworks in LiverpoolVacuum Excavation Case Study: A Visit To TamworthVacuum Excavation Case Study: A Visit To SouthamptonVacuum Excavation Case Study: Beach ExcavationVacuum Excavation Case Study: Airport ExpansionVacuum Excavation Case Study: Safer Suction for a SubstationVacuum Excavation Case Study: Relocating CablesVacuum Excavation Case Study: Providing A Non-Intrusive Excavation